FCC MAIN FRACTIONATOR - SIMPLIFIED HAZOP STUDY DIAGRAM
Click any red HAZOP Node target on the diagram to open its HAZOP Analysis Table (10+ Guidewords)
🔘 Instrumentation: ON
↺ Reset View
🖨️ Print / Export
FCC REFINERY PROCESS COMPLEX
MAIN FRACTIONATOR HAZOP P&ID
DWG: HAZOP-FCC-SIMPLIFIED-02
SCHEME: 1 IN / 4 OUTS
DESIGN: ASME SEC VIII / API 520
CLASS: HAZOP TEACHING MODEL
48"-RX-VAP-01 ➔
36"-OVHD-VAP (245°F)
TOP REFLUX (105°F)
TPA RETURN (210°F)
LCO DRAW (480°F)
VAPOR RETURN
150# STEAM
HCO DRAW (660°F)
VAPOR RETURN
150# STEAM
SLURRY QUENCH RECYCLE (580°F)
SKIRT BASE
VANE DEMISTER
NAPHTHA / TPA ZONE
LCO TRAY SECTION
HCO TRAY SECTION
SLURRY WASH ZONE
FEED INLET
BOTTOMS LEVEL
C-101
MAIN FRACTIONATOR
← TO FLARE | PSV-101 (45 PSIG)
E-101 CONDENSER
P-102A/B
REFLUX PUMP
P-105
TPA PUMP
E-105
TPA COOLER
C-102
LCO STRIPPER
P-103
E-102
LCO COOLER
C-103
HCO STRIPPER
P-104
E-103
HCO COOLER
P-101A/B
SLURRY PUMPS
E-104
SLURRY EXCH
PV-101 (FO)
PIC
101
FV-101 (FC)
FIC
101
TIC
101
FV-102 (FC)
FIC
102
LV-102 (FC)
LIC
102
LV-103 (FC)
LIC
103
LV-101 (FC)
LIC
101
FV-104
FIC
104
INPUT: FCC VAPORS
980°F | 25.0 PSIG
OUTPUT 1: GASOLINE
TO DEBUTANIZER / STORAGE
OUTPUT 2: LCO PRODUCT
120°F | DIESEL HYDROTREATER
OUTPUT 3: HCO PRODUCT
CUTTER STOCK / RECYCLE
OUTPUT 4: BOTTOMS (CSO)
CLARIFIED OIL / TANKAGE
245°F
19.5 PSIG
480°F
21.8 PSIG
660°F
23.2 PSIG
695°F
25.0 PSIG
N1
NODE 1: COLUMN
N2
NODE 2: OVERHEAD
N3
NODE 3: LCO STRIP
N4
NODE 4: HCO STRIP
N5
NODE 5: SLURRY/QUENCH
+
−
100%
HAZOP STUDY TABLE
Process Hazard and Operability Analysis (10+ Guidewords)
🖨️ Print / Export
✕ Close
Node 1: Main Column C-101
Node 2: Overhead & Gasoline
Node 3: LCO Stripper C-102
Node 4: HCO Stripper C-103
Node 5: Slurry Bottoms & Quench
Guideword / Param
Deviation
Typical Causes
Potential Consequences
Design Safeguards & Mitigations
C-101
PRIMARY FRACTIONATOR
FCC Main Fractionator Column
Primary desuperheating, heat extraction, and fractionating tower taking ~980°F catalytic cracker reactor effluent.