FCC MAIN FRACTIONATOR - SIMPLIFIED HAZOP STUDY DIAGRAM
Click any red HAZOP Node target on the diagram to open its HAZOP Analysis Table (10+ Guidewords)
FCC REFINERY PROCESS COMPLEX MAIN FRACTIONATOR HAZOP P&ID DWG: HAZOP-FCC-SIMPLIFIED-02 SCHEME: 1 IN / 4 OUTS DESIGN: ASME SEC VIII / API 520 CLASS: HAZOP TEACHING MODEL 48"-RX-VAP-01 ➔ 36"-OVHD-VAP (245°F) TOP REFLUX (105°F) TPA RETURN (210°F) LCO DRAW (480°F) VAPOR RETURN 150# STEAM HCO DRAW (660°F) VAPOR RETURN 150# STEAM SLURRY QUENCH RECYCLE (580°F) SKIRT BASE VANE DEMISTER NAPHTHA / TPA ZONE LCO TRAY SECTION HCO TRAY SECTION SLURRY WASH ZONE FEED INLET BOTTOMS LEVEL C-101 MAIN FRACTIONATOR ← TO FLARE | PSV-101 (45 PSIG) E-101 CONDENSER P-102A/B REFLUX PUMP P-105 TPA PUMP E-105 TPA COOLER C-102 LCO STRIPPER P-103 E-102 LCO COOLER C-103 HCO STRIPPER P-104 E-103 HCO COOLER P-101A/B SLURRY PUMPS E-104 SLURRY EXCH PV-101 (FO) PIC 101 FV-101 (FC) FIC 101 TIC 101 FV-102 (FC) FIC 102 LV-102 (FC) LIC 102 LV-103 (FC) LIC 103 LV-101 (FC) LIC 101 FV-104 FIC 104 INPUT: FCC VAPORS 980°F | 25.0 PSIG OUTPUT 1: GASOLINE TO DEBUTANIZER / STORAGE OUTPUT 2: LCO PRODUCT 120°F | DIESEL HYDROTREATER OUTPUT 3: HCO PRODUCT CUTTER STOCK / RECYCLE OUTPUT 4: BOTTOMS (CSO) CLARIFIED OIL / TANKAGE 245°F 19.5 PSIG 480°F 21.8 PSIG 660°F 23.2 PSIG 695°F 25.0 PSIG N1 NODE 1: COLUMN N2 NODE 2: OVERHEAD N3 NODE 3: LCO STRIP N4 NODE 4: HCO STRIP N5 NODE 5: SLURRY/QUENCH
HAZOP STUDY TABLE
Process Hazard and Operability Analysis (10+ Guidewords)
Guideword / Param Deviation Typical Causes Potential Consequences Design Safeguards & Mitigations
C-101 PRIMARY FRACTIONATOR
FCC Main Fractionator Column
Primary desuperheating, heat extraction, and fractionating tower taking ~980°F catalytic cracker reactor effluent.